by Équipe TEEPTRAK | May 2, 2026 | Industrial Performance
OEE Availability — 7 Improvement Tactics Ranked by Impact TL;DRAvailability measures the ratio of run time to planned production time. World-class is 88-90% for discrete manufacturing. Plants moving from manual to real-time tracking typically discover 40-60% of...
by Équipe TEEPTRAK | May 2, 2026 | Industrial Performance
The Six Big Losses — Pareto Analysis Framework for Manufacturing TL;DRThe Six Big Losses framework, developed by Nakajima as part of TPM, categorizes every manufacturing productivity loss into six categories mapped to OEE pillars. Combined with Pareto analysis, it...
by Équipe TEEPTRAK | May 2, 2026 | Industrial Performance
OEE vs TEEP vs OOE — A Decision Framework for Manufacturers TL;DROEE measures performance during scheduled production time. TEEP measures performance against all calendar time (24/7/365). OOE measures performance during operating time (staffed time). Use OEE for...
by Équipe TEEPTRAK | May 2, 2026 | Industrial Performance
OEE Formula — 5 Worked Examples from Real Manufacturing Plants TL;DROEE is calculated as Availability × Performance × Quality. This guide walks through 5 fully-worked examples from real plant data: a packaging line at 79.5% OEE, an automotive Tier-2 at 71.3%, a pharma...
by Équipe TEEPTRAK | May 2, 2026 | Industrial Performance
OEE Explained — A 2026 Guide for Mid-Market Manufacturers TL;DROEE (Overall Equipment Effectiveness) is the gold-standard manufacturing productivity metric. It is calculated as Availability × Performance × Quality, expressed as a percentage between 0% and 100%....