by Ravinder Singh | Mar 8, 2026 | Uncategorized
How to harmonize OEE measurement across multiple sites to enable reliable comparisons, share best practices, and drive continuous improvement across the group. Multi-plant OEE has become a major strategic issue for manufacturers operating in multiple locations. The...
by Ravinder Singh | Mar 8, 2026 | Uncategorized
When we talk about OEE (Overall Equipment Effectiveness), we immediately think of the shop floor: machine availability, production rates, scrap. OEE impacts suppliers and customers far beyond the workshop, yet most manufacturers still treat it as a purely internal...
by Ravinder Singh | Mar 8, 2026 | Uncategorized
OEE for make-to-order vs. make-to-stock manufacturing is a topic that most manufacturers are unaware of. A factory that produces to stock and a factory that produces to order may use the same machines and the same ERP system. But the way OEE impacts their performance,...
by Ravinder Singh | Mar 8, 2026 | Uncategorized
The impact of 5S on OEE is a topic that is underestimated by most manufacturers. 5S is often reduced to a tidying-up exercise, a cosmetic measure that is brought out before an audit or a customer visit. This is a fundamental misunderstanding. 5S is a direct lever for...
by Ravinder Singh | Mar 6, 2026 | Uncategorized
In today’s competitive industrial context, understanding and optimizing OEE, or Overall Equipment Effectiveness, is essential for manufacturing units like SPPU (Single Piece Production Unit). The major challenge for these units is balancing efficiency, quality,...