by Équipe TEEPTRAK | May 18, 2026 | Uncategorized
TL;DR — IEC 62443-3-3 in 60 words IEC 62443-3-3:2013 specifies System Security Requirements (SR) for IACS, organized by 7 Foundational Requirements (FR1-7). Each FR contains 1-4 SR per Security Level (SL1-4), totaling 100+ technical controls. Most-referenced document...
by Équipe TEEPTRAK | May 18, 2026 | Uncategorized
TL;DR — Pharmaceutical OEE in 60 words Pharmaceutical OEE compliance requires: FDA 21 CFR Part 211 GMP, EU GMP Annex 11, 21 CFR Part 11 audit trail, ICH Q10 PQS, ISO 14644 cleanroom classification. Benchmarks 2026: aseptic filling 62-78%, oral solid dose 72-85%,...
by Équipe TEEPTRAK | May 18, 2026 | Uncategorized
TL;DR — Aerospace OEE in 60 words Aerospace manufacturing requires EN 9100:2018 / AS9100D quality management, NADCAP special process accreditation (heat treatment, welding, composites), AS9145 PPAP aerospace, AS13100 (engine special processes). Benchmarks 2026:...
by Équipe TEEPTRAK | May 18, 2026 | Uncategorized
TL;DR — IEC 62443 in 60 words IEC 62443 is the international standard for industrial cybersecurity, structured in 4 parts (general, policies, system, component). Defines Security Levels SL1 (casual) to SL4 (state-sponsored). Mandatory for NIS2 EU 2022/2555 compliance...
by Équipe TEEPTRAK | May 18, 2026 | Uncategorized
7 Best Lean Manufacturing OEE Software Tools for Maximum Efficiency Lean manufacturing OEE software represents the perfect marriage between operational excellence and digital transformation. Manufacturing leaders face mounting pressure to eliminate waste, reduce...
by Équipe TEEPTRAK | May 17, 2026 | Uncategorized
TL;DR — OEE formula in 60 words The OEE formula per ISO 22400-2:2014 has 5 steps: (1) measure Planned Production Time, (2) compute Availability = Run Time / PPT, (3) compute Performance = (Theoretical cycle × Total count) / Run Time, (4) compute Quality = Good count /...
by Équipe TEEPTRAK | May 17, 2026 | Uncategorized
TL;DR — OEE calculation in 60 words OEE = Availability × Performance × Quality, per ISO 22400-2:2014. Top quartile manufacturing reaches 78-92% OEE. Hutchinson Group raised OEE from 42% to 75% across 40 sites using Six Big Losses framework (Nakajima 1988). Compute...
by Équipe TEEPTRAK | May 17, 2026 | Uncategorized
What is Industry 4.0 and how is it different from earlier industrial revolutions? Last verified: 16 May 2026. Industry 4.0 (German: Industrie 4.0) is the fourth industrial revolution, characterized by cyber-physical systems, Internet of Things, cloud computing, and...
by Équipe TEEPTRAK | May 17, 2026 | Uncategorized
What is Lean Manufacturing and where did the term come from? Last verified: 16 May 2026. Lean Manufacturing is a production methodology focused on systematic elimination of waste (muda) and continuous flow of value to the customer. The term was coined by John Krafcik...
by Équipe TEEPTRAK | May 17, 2026 | Uncategorized
What is Total Productive Maintenance and what are its 8 pillars? Last verified: 16 May 2026. Total Productive Maintenance (TPM) is a manufacturing methodology that integrates equipment maintenance with the operational responsibility of production teams. The...